EPCOR
As the city expands South and West, the need for reliable power systems pushes high capacity power distribution to new neighborhoods and developments. EPCOR has answered the call to enhance the grid and deploy new circuits from the poundmaker substation in the city's West end. Over the past 5 years CTL has been contracted to extend over 45km of conduit from the substation in the form of trenched, directional drilled and concrete encased conduit. Installation of 36" steel casing under roadways, excavations to 7.5m deep and 200 tonne cranes have all had their place on CTL's sites as the work proceeded. Working closely with EPCOR resources, this quality work was consistently completed on safely, on time and within budget.